Smart Home Budget Calculator — by Shield Low Voltage

What Will Your Smart Home
Actually Cost?

Describe the house and the systems you want. This returns an installed investment range — hardware, cabling, labor and programming — the same way we build a real proposal. No email required to see the number.

The house
Project type
Finished square feet 4,500

In new construction we pre-wire during framing, which is the cheapest moment to do everything right. Existing homes cost a little more per system because we fish wire or use wireless gear.

Performance tier

What the system runs
Audio zones 4
TV locations 3
Motorized shades 8
Lighting loads controlled 20
Climate zones 2
Cameras 4

A lighting load is one circuit on a dimmer or switch — a typical great room has four to eight. Shades are counted per window.

Add-ons

Projected investment range

$0to$0

Installed · hardware, cabling, labor and programming

$0per sq ft, midpoint
—control platform
—typical install

How to read this

    Book a Free Walkthrough →

    Where the numbers come from

    Priced the Way
    We Write Proposals.

    Every range here is built from what these systems cost installed in Utah homes in 2026 — the gear, the cable, the labor and the programming hours that make it work as one system. The low end assumes clean access and mainstream components; the high end assumes the top of that tier, difficult construction, or both. Real proposals land inside the range once we have walked the house.

    Foundation

    Alarm.com, Lutron Caséta, Sonos, UniFi. App control, reliable, expandable. The right answer for most homes under 4,000 square feet and for anyone who wants results without a dedicated control processor.

    Luxury

    Control4 at the center, Lutron RadioRA 3, in-wall touchscreens and keypads, distributed audio and video, cameras on the screens. One interface for the whole house. Where most of our custom-home work lives.

    Estate

    Crestron Home or Savant, Lutron HomeWorks, Palladiom keypads and shades, reference audio and video, a dedicated theater. Engineered, documented, and standardized across a large property.

    Before you build

    The Cheapest Dollar
    Is the One Spent Before Drywall.

    Pre-wire is a small line on a new-construction budget and the reason every other system costs less and works better. If you are building, run this tool with “new construction” selected, then read what we run before the drywall goes up. If the house exists, the numbers already include the extra labor of doing it right in finished walls.