Pre-Wire for Custom Builds
Your Low-Voltage
Partner.
We work with custom home builders across the Wasatch Front — one subcontractor covering security, network, audio and automation, bid accurately, wired inside your window, and supported long after you hand over the keys.

Why Builders Use Us
The Trade Most Likely
to Bite You Late
Low voltage is small money against the build and an outsized share of the problems — because it touches every room, lands late, and is the one system your client will use every single day.
- One sub instead of four. Security, network, audio and automation on a single scope, so nothing falls into a gap between contracts
- We take the technology conversation. We sit with your client, walk the plan, and come back with positions and a number — you are not translating between a homeowner and a spec sheet
- Bids that hold. Priced off the plan set, with allowances that reflect what the house actually needs rather than a number that grows at trim
- We hit the window. Rough-in scheduled against your inspection, not against our convenience
- Warranty calls come to us. Your client rings us at year two, not you
Most of our work comes from builders who used us once and stopped shopping it. That is the whole business model — we would rather be your low-voltage sub on twenty houses than the cheapest bid on one.
One Contract, Four Systems
What’s In Our Scope
Everything below is bid, rough-wired and trimmed by the same crew. Each links through to what it becomes in the finished house.
Security
Door and window contacts, motion and glass-break locations, keypad and panel positions, and camera runs placed to cover the approach rather than the easy corner.
Network
Wired runs to every television, office and workspace, ceiling positions for access points so coverage is designed rather than hoped for, and a structured panel sized with room to grow.
Audio & Theatre
In-ceiling and in-wall speaker locations, surround and height channels, subwoofer positions, patio and landscape runs, and a planned home for the equipment rack.
Control & Comfort
Keypad boxes at doors and bedsides, thermostat and sensor runs, shade power at the window heads, and gate, doorbell and lock feeds — the ones most often missed.
Happy to bid the whole package or just the piece you are short on — plenty of builders start us on network only.

Your Schedule
Four Touches,
No Surprises
We are on your site four times, and we tell you well before each one. Low voltage is last in at rough-in and easy to squeeze — so we plan around that rather than complain about it.
- Plans and bid. Send the plan set. We mark it up, price it, and walk it with your client before anything is ordered
- Rough-in. After electrical and mechanical, before insulation. Usually one trip, scheduled against your rough inspection
- Trim-out. Devices, speakers, panels and terminations once paint and ceilings are done
- Handover. We commission the system and sit with the homeowner so they leave the walkthrough knowing how to use it
If your date moves, tell us and it is fine. What causes trouble is finding out at drywall — and that is the one call we ask every builder to make.

Workmanship
It Reflects on You
Before It Reflects on Us
Your client sees the open walls, and they see the panel when it is finished. Both are a statement about the builder who chose the sub.
- Runs pulled straight, tied at even intervals, radius respected so the cable performs to spec
- Labelled at both ends, with service loops at every device and in the panel
- Line-voltage separation kept properly, and inspection-ready without a scramble
- Photographed before insulation — a record of what is inside every wall, handed to you and the homeowner
- Site left clean, because the next trade in is your problem otherwise
Send us to a job and look at the walls before drywall. That is the fairest test there is, and it is the reason we ask for the first one.

Owner-Builders
Running Your Own Build?
A fair number of the homes we wire are managed by the people who will live in them. It works well, and the low-voltage part is more straightforward than most trades — provided the decisions get made before the walls close.
The trade-off is simple: cable is close to free while the framing is open, and expensive afterwards, because the same run then means cutting, patching, texture and paint. You do not need to buy equipment now. You need to decide where it might go and put wire there.
We will walk the plan with you, tell you plainly which runs matter and which are optional, and coordinate directly with your electrician and framer so you are not relaying messages between trades.
The window is framing complete to insulation. Miss it and the decision gets made for you.
Send Us
the Plans.
We’ll mark them up, price the scope, and give you a date — whether that’s for one house or a season of them.